Enhancing T.W. Moses Treatment Plant Efficiency
Enhancing T.W. Moses Treatment Plant Efficiency
Citizens Energy Group’s Southport Advanced Wastewater Treatment Plant (Southport AWTP) went through a capacity expansion to fulfill treatment capacity as committed in the Long Term Control Plan Consent Decree. The National Pollutant Discharge Elimination System (NPDES) permit regulates different wastewater constituent discharge concentration limits and seasonal limits of different parameters have been established for decades.
With intense heat during the summer months, the higher temperature of wastewater leads to a lower DO saturation concentration, presenting a challenge to meet effluent DO concentrations required by the NPDES permit. The senior design team will examine the field DO concentrations at the Southport AWTP; evaluate the hydraulic characteristics that influence DO, investigate measures to increase DO throughout the treatment processes; and identify potential cost effective improvements.
